Release Date:2023-10-13
Reading volume:
The project is located in the rural areas of Fuqing City, in order to solve the problem of sewage discharge generated in rural production and life, several sets of integrated sewage treatment equipment are installed, so that the sewage in each rural area can be discharged up to the standard.
Meet the "Urban sewage Treatment plant pollutant Discharge Standard" (GB18918-2002) Grade A standard
Domestic sewage → collection well → regulating tank → AO+MBR+ disinfection integrated sewage treatment equipment → discharge up to standard