Project Overview

In order to solve the problem of standard discharge of domestic sewage in construction projects, living gathering areas and other places, two sets of integrated sewage treatment equipment are constructed and installed.

Water production standard

Meet the basic control items and limit requirements of urban miscellaneous water quality in table "Urban Sewage Recycling Landscape Environment Water Quality" (GB/T18921-2019) and "Urban Sewage Recycling Urban Miscellaneous Water Quality" GB/T18920-2020.

Technology

Domestic sewage → septic tank → Regulating tank → A2O+MBR integrated sewage treatment equipment → reservoir