Xinjiang Water Plant 6000 tons/day Raw Water Purification Project

Release Date:2023-10-13

Reading volume:

Xinjiang Water Plant 6000 tons/day Raw Water Purification Project

Project Overview

To solve the problem of nitrate exceeding the standard in the raw water of Xinjiang Water Plant, the nitrate is removed to meet the water production standard. The water production capacity of the water plant is 8000 tons per day, and according to the treatment situation of the reverse osmosis system, a set of 6000 tons per day water purification equipment needs to be added to blend the produced water. Water production standard: The system's water production meets and exceeds the national "Drinking Water Standard" (GB5749-2022).

Water production standard

The system produces water that meets and exceeds the national standard for drinking water (GB5749-2022)

Technology

Reverse osmosis system+CIP cleaning system+dosing system+sterilization system+automatic control system