Release Date:2023-10-11
Reading volume:
Located in the Laoshan Bay in the eastern part of Jimo, based on the current number of tourists visiting the island and combined with long-term tourism planning, in order to solve the water shortage problem of Xiaoguan Island, it is planned to build a 300 m3/d seawater desalination project on the island.
Comply with the national standard for drinking water (GB5749-2022)
Water intake system → pre-treatment (UF ultrafiltration) system → primary+secondary RO reverse osmosis system → mineralization and sterilization system → automatic control system → water supply system