Three Ring Electroplating Plant Ultra Pure Water Project

Release Date:2023-10-13

Reading volume:

Three Ring Electroplating Plant Ultra Pure Water Project

Project Overview

The electroplating wastewater treated with reclaimed water reuse equipment in the electroplating industry can fully meet the reuse or discharge standards. Electroplating wastewater mainly consists of pre-treatment acid alkali washing wastewater and electroplating process rinsing wastewater, among which the main pollutants of acid alkali wastewater are washed oil, rust, acid alkali, etc. After simple physicochemical treatment, it can be discharged or reused after further deepening treatment.

Water production standard

Ultrapure water

Project scale

800 m3/d

Technology

Raw water → Pretreatment → Primary reverse osmosis → Secondary reverse osmosis → EDI device → UV sterilizer → Water point