PROJECTS

Shandong Hengtong Chemical Industry-500t/h Ultra Pure Water Equipment install

Release Date:2023-10-13

Reading volume:

Shandong Hengtong Chemical Industry-500t/h Ultra Pure Water Equipment install

Project Overview

The raw water of this project undergoes pre-treatment to remove the majority of suspended solids and colloids, and then undergoes desalination treatment by a reverse osmosis device. Finally, the RO concentrated water is reused.

Water production standard

NameSecondaryProduction water supply
PH range (25 ℃)5.0-7.5
Conductivity(25℃/(mS/m)≤20≤0.1
Oxidable content (denoted as 0)/(mg/L)≤0.08≤0.4
Absorbance (254n, 1cm optical path)≤0.01
Evaporation residue (105 ℃± 2 ℃) content/(mg/L)≤1.0≤2.0
Soluble silicon (calculated as SiO2) content/(mg/L)≤0.02

Technology

Multi media+UF ultrafiltration system+RO reverse osmosis system+EDI 

TOP