PROJECTS

Panshi Hongri Biomass Energy - Boiler Makeup Water Demineralization Device Project

Release Date:2023-10-13

Reading volume:

Panshi Hongri Biomass Energy - Boiler Makeup Water Demineralization Device Project

Project Overview

The overall project is undertaken by Xingrun Construction Group Co., Ltd. The production water is boiler make-up water, and the source groundwater is treated to 10 megaohms. The project scale is: integrated: 250m ³/ H; Water treatment equipment: 60m ³/ H.

Water production standard

Boiler make-up water

Technology

Raw water → Raw water booster pump → Multi medium filter → Activated carbon filtration → Water softener → Precision filter → Reverse osmosis device → Polishing mixed bed → Water outlet point

TOP